Cost by material

What a deck costs

Prices are per square foot, installed, with footings, framing and the permit. Railing and stairs are priced separately because they change a lot from deck to deck.

Example

A 16 by 20 foot composite deck, 4 feet off the ground, with aluminum rail and one set of stairs.

About $23,500

320 sq ft at $55, 52 feet of rail at $90, 5 steps at $250.

Decking and framing
MaterialPer sq ft, installedLasts aboutUpkeep
Pressure-treated pineSouthern yellow pine, ground-contact rated $25 to $45 15 to 20 years Clean and seal every 2 to 3 years
Western red cedarTurns silver gray if you leave it unsealed $35 to $55 15 to 20 years Clean and seal every 2 years
Composite, standard[Brand] or [Brand] entry lines $45 to $70 25 years or more Wash it in spring and fall
Composite, capped premiumBetter fade and stain warranty, more colors $60 to $90 30 years or more Wash it in spring and fall
Railing, stairs and tear-out
AddPriceNotes
Wood railing$35 to $60 per linear footMatches the decking, needs sealing with it
Aluminum railing$70 to $110 per linear footBlack or bronze, no upkeep
Cable railing$100 to $180 per linear footKeeps the view open, check your HOA first
Stairs$200 to $350 per stepIncludes the landing pad at the bottom
Tear-out of an old deck$5 to $10 per sq ftWe haul it away

Decks over 8 feet off the ground, hot tub loads and sloped yards cost more. We give you a written price after the consult.

Financing

Financing is available through [Lender]. You apply on their site and know what you qualify for before you sign with us.

Built to code

What holds your deck up

We pull the permit and meet the inspector at footings and framing. The ledger is bolted to the house and flashed so water stays out of the wall.

That connection to the house is where most deck failures start, so it is the part we spend the most time on.

  1. Footing

    Concrete poured below the frost line, shown dashed. The inspector checks the holes before we pour.

  2. Post

    A 6x6 treated post on a galvanized base that holds the end off the concrete.

  3. Beam

    Two or three 2x10s or 2x12s, sized to the span and tied to the post with a galvanized cap.

  4. Joists

    2x8 to 2x12 at 12 or 16 inches apart, hung from the ledger in galvanized hangers.

  5. Ledger

    Bolted through to the house framing. Inspectors reject a ledger held with nails alone.

  6. Flashing

    Tucked behind the siding and bent over the ledger so water runs off the front of the board.

  7. Decking

    Wood or composite boards, screwed or clipped, with the gap the manufacturer calls for.

Our process

From the first visit to the final inspection

  1. Consult at your house

    We measure, look at the wall where the deck will attach and go over materials and budget with you. It takes about an hour.

  2. Drawing and written price

    You get a drawing and a price within [number] days. A [deposit]% deposit holds your spot on the schedule.

  3. Permit

    We pull it and send the county the drawings it asks for. In Your City that usually takes [2 to 4] weeks.

  4. Build

    Footings go in first and get inspected. Then we frame, the inspector comes back, and we put down the decking and build the rails and stairs. Most decks take [number] working days on site.

Build schedule

We are booking builds for [month] now.

The spring schedule fills first. A consult in the winter puts you on it.

The balance is due when the deck passes final inspection.

Book a consult
Replace with: the yard mid-build with footing holes dug and marked, so people know what to expect.

Licensed and insured

Permits
We pull them
Contractor license
# 00000
Insurance
Liability and workers' comp, certificate on request
Composite installer
[Brand] certified, # 00000
Reviews

From people we built for

When they tore off our old deck they found rot in the ledger board and showed it to me before they replaced it. The new deck took eight working days.

Dana K.Deck replacement

The footings and framing both passed on the first inspection. The price in the contract is what we paid.

Marcus T.New composite deck

We were torn between cedar and composite. He priced both and told us the cedar would need sealing every other year, which made the decision for us.

Priya S.Composite deck with stairs
Consult

Book a consult

Tell us what you have in mind and send a few photos. We will call to set a time to come out. The consult is [free].

  • The wall of the house where the deck would attach, including the door
  • The yard from the back corner, so we can see the slope
  • Your old deck from underneath, if you have one

Consult request

For example "12 by 16" or "about 300 sq ft".

Up to 8 photos. JPG, PNG or HEIC, 10 MB each. The wall where the deck attaches and the yard help most.

A hot tub, a grill spot, an HOA that needs to approve it.

We use your details to set up the consult and for nothing else.